Sunday, 11 September 2011

SPLICING OPERATION --Step 4--


Place the end of the fiber into the fiber guide and insert the fiber into the Light bridge splice. The fiber is automatically aligned in the v-groove.

Secure the fiber in the fiber clamp. Holding the fiber in each hand, place the fiber over the jaws of the clamp and pull the fiber down into the clamp. Securing the fiber can be assisted by pushing down on the back of the clamp with your index finger to open it. Slide the fiber into the open jaws and release the clamp. Be sure to leave a small amount of slack in the fiber between the clamp and the fiber groove.


No comments:

Post a Comment